Thursday, May 14, 2009

Tour of Main Town North, 19th Street

Sim Date 09.12.291
Population 378,782

I'm going to go down 19th. St., from North to South.


If your not sure of the location of 19th. St.
The North end starts near the NE corner of
the city. (21st. St. is the farthest East Road).
Runnig Southward with commercial zones on both sides
to the Airport (along the East side of the Airport).
Then through the Airport Industrial Area and
exiting the city on the South.




In picture #1 heading south you see a little ballpark on the left.
On the Right is a

Elementary School
237 students
375 capacity

Bus Stop just south of the school
130 passenger usage
1000 passenger capacity

Passenger Train station
to the left
6 passenger usage
2000 passenger capacity
(not much traffic, but it should increase)

Picture #1


In Picture #2 as 19th St. goes past the Train Station, I've used an
elevated Highway to bridge the Rail Road tracks.
At the south end of the bridge.

Bus Stop
364 passenger usage
1000 passenger capacity

Police Station
8 inmates
60 cell capacity


I will have to check my police funding, I maybe able to lower it.

Fright Train Station
0 tons usage
2000 Tons capacity

I have a few Train Shipping docks that have no usage.
I'm not sure if I should get rid of them or just wait for traffic?

Picture #2


In picture #3 19th St. goes under the I-502 HWY

I-502 HWY
230 car traffic
278 bus traffic

Bus Stop
1707 passenger usage
1000 passenger capacity


I've added a new Bus Stop just to the left of that one.
(I will update the progress of those Bus Stops).
I could probably add some trees or Park in that open strip.

Bus Stop
105 passenger usage
1000 passenger capacity

Hospital
2563 patients
2729 capacity

Bus Stop
186 passenger usage
1000 passenger capacity


You can also see 20th St, in these pictures.
On the other side of 20th just past the
I-502 is an unnamed industrial zone that
will run southward to the AirPort where it will
become part of the Airport Industrial Area.

Picture #3


In picture # 4 19th St. goes past Lake Luther Rd.
You can see two abondon buildings. I have trouble
keeping Residential property there and in the
Neighborhood just to the south in picture #5
I see a Bus Stop on 19th St. and 2 Bus Stops near 19th St.
But must have miss them when I was collecting the
Information for this set or pictures.

Picture #4


In picture #5 19th St. runs past Tower rd. (for CN Tower).
The other (unnamed Neighborhood)
that has trouble keeping population.
The CN Tower in just to the west of these hoods,
So when I name them it will probably have
something to do with that.

Bus Stop
186 passenger usage
1000 passenger capacity

Bus Stop
26 passenger usage
1000 passenger capacity

Elementary School
149 students
259 capacity

Fright Train Station
0 tons usage
2000 Tons capacity

Picture #5


Picture #6 Another neighborhood that is having
population trouble on the left,

Bus Stop
106 passenger usage
1000 passenger capacity

Bus Stop
112 passenger usage
1000 passenger capacity

Bus Stop
619 passenger usage
1000 passenger capacity

Bus Stop
845 passenger usage
1000 passenger capacity

Picture #6


In picture #7 I see another neighborhood struggling
With population growth to the left.
There is also what looks Like a police helicopter
with it’s spot light on, (by the twin buildings on the corner).

Bus Stop
805 passenger usage
1000 passenger capacity

Hospital
1205 patients
1319 capacity
$440 funding
$240 ambulance funding
$240 is the maximum funding for ambulance.

Picture #7


There is a gap between picture #7 and # 8,
You only miss two commercial buildings
On each side of the road.

Bus Stop
994 passenger usage
1000 passenger capacity

picture #8


In picture #9 19th St. passes under the I-519 HWY

I-519 HWY
578 car traffic
1164 bus traffic

Passenger Train station
1307 passenger usage
2000 passenger capacity

Bus Stop Added.

Bus Stop
1428 passenger usage
1000 passenger capacity

Bus Stop
12 passenger usage
1000 passenger capacity

picture #9


In picture #10 I again have used an elevated Highway
as a bridge over the Rail Road.

Traffic on the bridge
Car 484 Bus 1534

Fright Train Station
0 tons usage
2000 Tons capacity

picture #10


In picture #11 19th St. narrows down to a two lane road.

Airport
126,045 tons air traffic
160,916 tons capacity
$1666 cost

Picture #11


In picture #12 19th St. runs through the
Airport Industrial Area where it has to curve
around a Rail Road intersection.

Bus Stop
146 passenger usage
1000 passenger capacity

Fright Train Station
16 tons usage
2000 Tons capacity

Picture #12


In picture #13 19th St. Exit’s the city at the south end.

Passenger Train station
0 passenger usage
2000 passenger capacity

Bus Stop
6 passenger usage
1000 passenger capacity
Picture #13

That was a long trip down 19th Street. I would look at
getting rid of some of the train stations, but my money
situation is in good shape (over $5 million).

I think I’ll start a trip down 3rd St. next, but I may do it in
Segments. It took a long time to do 19th St. in one post.
3rd St runs North to South through Uptown and
The Downtown areas.
Thanks for checking My SimCity, Louie
Please click on one of my sponsors.

No comments:

Post a Comment