Wednesday, July 8, 2009

Rebuilding The North Power Plant

Sim Date -01.15.297
Population - 381,433

I Balanced my Budget, by demolishing the North Power Plant.

Power Plant (North Plant)
Efficiency (Balloon's) 2.75
Local Funding $18,695
Max. Capacity 50,000 MWh
Plant Condition 47%
Actual Capacity 25,943
Power Used 15,707 MWh
Capacity Used 60%
Cost MWh $.60

My Current power situation after demo.

Actual Power Capacity: 54,731
Power Used: 49,011

So I decided to build a new North Plant.



New Power Plant (North Plant)

Local Funding $9,800
Max. Capacity 50,000 MWh
Plant Condition 100%
Actual Capacity 47,999
Power Used 30,085 MWh
Capacity Used 62%
Cost MWh $.21

Power Plant (South Plant)

Local Funding $9,828
Max. Capacity 50,000 MWh
Plant Condition 99%
Actual Capacity 47,765
Power Used 29,938 MWh
Capacity Used 62%
Cost MWh $.21

To off set cost:

I lowered funding to the point of where efficiently dropped.

I canceled Power Buying Deals and Increased Power selling deal with E.
Centertown from 9,000 MWh to 11,000 MWh.

Current Power Deals:

Centertown buys 4,000 MWh for $995
E. Centertown buys 11,000 MWh for $2,297
N. Western Town
buys 2,000 MWh for $500



Power Graph reads apx.
Capacity 100,000 MWh
Usage 60,000



Thinks for stopping by, Louie

No comments:

Post a Comment